CHAPTER 2 INSTALLATION
– 55 –
ND-71503(E) Rev.5.0
9pch2001.fm
REQUIRED EQUIPMENT
This table shows the required equipment.
Required Equipment
*
: Should be provided by customer.
**
: AC-DC Adapter or inline power patch panel must be provided.
Continued on next page
EQUIPMENT
DESCRIPTION
QUANTITY
REMARKS
PN-CP24-A/
PN-CP24-B (MP)
MP Card
1
One card per system
Mount on PIM0
PN-CP27-A (MP)
MP Card for Backup CPU
System
2
Two cards per system
Mount on PIM0
PZ-M606-A (ETHER)
Ethernet Control Card
1
Mount on PN-CP24-A/
CP24-B card
One card per MP
2
Mount on PN-CP27-A card
One card per MP
• 10BASE-T Cable
(TIA/EIA category 3 or
larger)
*
• 100BASE-TX Cable
(TIA/EIA category 5)
*
10BASE-T/100BASE-TX
Cable between Ether Card
and Ethernet, IP-PAD Card
and Ethernet, IPT Card and
Ethernet
As required
Cable length:
Maximum 100m (328 ft.)
For IP-PAD, 100BASE-TX
is recommended.
Router
*
NOTE:
Cisco Router is
recommended.
As required
HUB
*
NOTE:
Switching HUB is
required for
ETHER and IP-
PAD.
As required
IPW-2U UNIT
**
/
IPW-2UA UNIT
**
IP Adapter for D
term
75
1-956
One per D
term
75
IP-R UNIT
**
/
IP-RA UNIT
**
IP Adapter for D
term
85
(Series i)
1-956
One per D
term
85 (Series i)
SEPTEMBER/15/2004
REQUIRED EQUIPMENT
CÔNG TY VIỄN THÔNG VIỆT PRO
Chuyên phân phối tổng đài NEC
http://vietpro.com.vn