background image

Step 8

 

1.

Insert standard straight through Ethernet cable into OPS 
PC network port and connect to client network.

 

2.

Now that the OPS PC is installed and the network 
connection is in place, connect the power cord to the 
display.

 

3.

Stand the display upright and turn on the power (power 
switch is located beside the power cord)

 

4.

Using either the remote or the buttons on the display, select 
the OPTION input. (Will show Option D on the display)

 

5.

Verify the display powers on and that Windows starts up.

6.

Rise Display content should automatically start playing in a 
few minutes.

 

7.

Now that the LCD and OPS PC have been verified to work 
properly, disconnect the Ethernet cable, power down the 
display, and proceed with the installation of the LCD.

 
 

Revised 12-30-2011 

        Page 

6

Summary of Contents for OPS i5 PC

Page 1: ...OPS i5 PC Install Guide for X Series NEC displays Revised 12 30 2011 Page 1 ...

Page 2: ...ilips Head Screw Driver Ethernet Patch Cable Step 1 1 Remove LCD display from box and lay screen face down on the box 2 Carefully remove protective plastic cover to expose the right side of the back of the LCD display where OPS slot is located Revised 12 30 2011 Page 2 ...

Page 3: ...ndle in place 2 When handle is removed place the two screws back into the holes in the display but be sure to stop tightening as soon as you meet resistance screws will NOT go all the way back in flush 3 Set handle aside For 40 and 46 LCD s the handle will not be re installed as it will be in the way of accessing the OPS PC For 55 displays where the handle is not blocking access to the OPS PC remo...

Page 4: ...moving the factory cover install the Option board slot cover 2 Using Phillips head screwdriver remove the two slot retaining screws at the front of the slot Save these 2 screws as you will use them to secure the OPS PC in place once installed Note also in image the 2 handle screws that have been re inserted in the previous steps but that do NOT go in all the way Revised 12 30 2011 Page 4 ...

Page 5: ...operly do not force IMPORTANT make sure the fan is visible and facing away from the display as you insert it Step 7 1 Using Phillips head screwdriver replace the 2 screws you removed in step 5 2 to secure OPS PC into place Note the NEC logo position in image to the right Revised 12 30 2011 Page 5 ...

Page 6: ...er switch is located beside the power cord 4 Using either the remote or the buttons on the display select the OPTION input Will show Option D on the display 5 Verify the display powers on and that Windows starts up 6 Rise Display content should automatically start playing in a few minutes 7 Now that the LCD and OPS PC have been verified to work properly disconnect the Ethernet cable power down the...

Reviews: