D-7
3.
Install the attached bracket (see the figure below) with the flush screw removed in step 2
loosely. (Make sure that the moving part of the rail can slide smoothly.)
4.
Insert the top and bottom projections into the angle holes on the front of the rack.
Bracket
Insert
Enlarged view of
encircled part