Issue 4.1
UNIVERGE SV8100
3 - 40
Installing the SV8100 Chassis
2.7.1
Unpacking the Equipment
Inspect the equipment for any physical damage. If you are not sure
about the function of a component, review the associated information
within this manual. Contact your authorized NEC Sales
Representative if you have additional questions. Note that the
chassis does not initially contain any blades.
Make sure you have appropriate tools for the job, including: a test
set, a punch down tool, and a digital voltmeter.
Ensure that you have a building plan showing common equipment,
extensions, the Telco demarcation and earth ground location before
you start installation. Be sure to properly plan your installation site
and that you are familiar with the installation safety precautions. If
you have not done that, please do so now.
2.7.2
Before Installation
Before installing the chassis check the following:
Ensure that the MPS7101(Power Supply Unit) is
OFF
and that
that the power cord is disconnected from the AC outlet.
When installing the blades,
do not touch
the soldered surfaces
as this may cause damage.
Summary of Contents for Univerge SV8100
Page 1: ...System Hardware Manual Issue 4 1 February 2011...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Page 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Page 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Page 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Page 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Page 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Page 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...