Issue 4.1
UNIVERGE SV8100
3 - 50
Installing the SV8100 Chassis
2.7.4.4
Connect the Controlling and Expansion Chassis
.
Installment of the PZ-BS10 blade and PZ-BS11 blade(s) must be
completed prior to installation of the provided (CAT 5) expansion
cabling.
1.
Ensure Controlling and Expansion chassis are
powered down.
2.
Using the NEC provided CAT5 straight-through
cable(s), attach one end to each Expansion Chassis
CN2 connector on the PZ-BS11 blade (see
Figure
3-62 System Expansion Cabling on page 3-51
.
Attach the opposite end to the CN2, CN3 or CN4
connector on the PZ-BS10 of the Controlling
Chassis.
Figure 3-61 19” Expansion Chassis Interface Units
Expansion Chassis Interface Unit
for the Controlling Chassis
PZ-BS10
Expansion Chassis Interface Unit
for the Expansion Chassis
PZ-BS11
Summary of Contents for Univerge SV8100
Page 1: ...System Hardware Manual Issue 4 1 February 2011...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Page 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Page 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Page 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Page 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Page 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Page 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...