Installing the SV8100 Chassis
2.7.8
Install AC Power Cords on Multiple-Chassis (Optional)
1.
Locate the supplied AC power cords and attach to the AC Inlets
located on the back of the Controlling and Expansion Chassis.
2.7.9
Install Additional Blades
Refer to Chapter 5,
2.1 Installation and Safety Precautions on page
4-3
.
2.7.10
Apply Power to the 19” Chassis
Refer to Chapter 5,
2.6 Powering Up the SV8100 on page 4-9
.
2.8
Installing the 9.5” Chassis
The 9.5" chassis provides 48 total ports (32 digital terminals) and can include
any combination of stations and trunks below this number.Install 9.5” Chassis
Grounding.
From the factory, the SG, ETH and PBXG grounds are located inside the
chassis and are connected to the FG (frame ground) on the back of the
chassis.
1.
Ensure the 9.5” chassis (CHS2U GW) is powered off and the AC power
cord is unplugged.
2.
Ground the chassis by connecting a 14 AWG wire from the FG lug on the
Figure 3-66 Install 19” AC Power Cords (Multiple-Chassis)
AC Power
Cords to
AC Inlets
Summary of Contents for Univerge SV8100
Page 1: ...System Hardware Manual Issue 4 1 February 2011...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Page 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Page 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Page 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Page 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Page 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Page 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...