There are two types of battery connection to provide battery life in the event of a
power failure, the internal battery and an external battery with CHS LARGE BATT
BOX.
3.1
Installing the Internal Batteries
An internal battery source using two batteries can be installed using the
CHS2U BATT MTG KIT (mounting kit) and CHS2U BATT CABLE INT (internal
cabling).
CHS2U BATT MTG KIT (Backup time = 10 Minutes/24 Terminals)
1.
Ensure the chassis is powered down.
2.
Disconnect AC power and grounding cable from rear of chassis.
3.
Remove screws from battery access panel on rear of chassis. Refer to
Figure 3-68 Removing Battery Access Panel
.
Figure 3-68 Removing Battery Access Panel
Ensure the CHS2U chassis is powered OFF.
Summary of Contents for Univerge SV8100
Page 1: ...System Hardware Manual Issue 4 1 February 2011...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Page 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Page 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Page 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Page 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Page 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Page 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...