Issue 4.1
UNIVERGE SV8100
3 - 72
Installing the SV8100 Chassis
3.3
Installing the External Batteries 9.5” Chassis
An optional, CHSGW SMALL BATT BOX can be installed to provide external
battery power to the CHS2U GW chassis during a power failure. The short-
term battery box will power the system for approximately 10 minutes.
3.3.1
Battery Installation
1.
On the battery box compartment, remove the two screws then
lift and set aside the top cover.
2.
Remove the metal support bracket.
3.
Insert the two short-term batteries.
4.
Place the battery cable on top of the batteries and adjust to take
up the extra length. Allow enough length for the connections to be
made to the equipment.
Figure 3-93 Remove Top Cover of Battery Compartment
Figure 3-94 Installing the Batteries
Summary of Contents for Univerge SV8100
Page 1: ...System Hardware Manual Issue 4 1 February 2011...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Page 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Page 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Page 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Page 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Page 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Page 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...