Issue 4.1
UNIVERGE SV8100
4 - 82
Installing the SV8100 Blades
2.
Before proceeding to Step 3, wait to verify that the STATUS
LED starts to flash.
3.
Connect the cable from the NT1 Network Termination cable to
the CN7 or CN8 connector on the CD-2BRIA and/or PZ-2BRIA
daughter board.
5.4.3
Connectors
Table 4-42 PZ-2BRIA RJ-45 T-Bus Cable Connector Pin-Outs
show
the pin-outs for the RJ-45 cable connector for S-Bus and T-Bus
connections. Refer to
Figure 4-27 Installing the PZ-2BRIA Daughter
Board on page 4-80
for an illustration showing the location of the
connectors on the PZ-2BRIA daughter board.
Table 4-42 PZ-2BRIA RJ-45 T-Bus Cable Connector Pin-Outs
RJ-45 Cable Connector – CN2
S-Bus Connection
Pin No.
Connection
1
—
2
—
3
RA
4
TA
5
TB
6
RB
7
—
8
—
With normal operation, the status LED
flashes fast. If trouble was found during
the self diagnostics routine, the status
LED flashes slow.
Once connected, the PKG LED will not
be indicated for the status of Layer 1 link.
Summary of Contents for Univerge SV8100
Page 1: ...System Hardware Manual Issue 4 1 February 2011...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Page 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Page 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Page 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Page 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Page 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Page 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...