UNIVERGE SV8100
Issue 4.1
System Hardware Manual
4 - 95
Two Blade status LEDs
Two straps and one switch per circuit to determine the circuit type
Table 4-51 CD-4ODTB Maximum Upgrade Capacities
provides the
maximum capacities for the ODT blades when they are upgraded.
5.7.2
Installation
1.
Set the straps for either the 2-wire or 4-wire. Refer to
Figure
4-32 CD-4ODTB Blade on page 4-94
.
2.
Install the CD-4ODTB into a slot in the chassis.
Table 4-51 CD-4ODTB Maximum Upgrade Capacities
19” Chassis
with CPU
19” Chassis
without CPU
19” Chassis
x4
Networked
Chassis
5
6
23
50
Limitation depends on the connecting Router,
Multiplexer or Exchange. If the UNIVERGE
SV8100 is connected to another UNIVERGE
SV8100 directly, there is up to 1,500 ohms loop
resistance (including system).
When a router or multiplexer is connected
instead of a trunk, the SG terminal of the router
or multiplexer must be connected to the FG
grounding terminal on the UNIVERGE
SV8100 chassis. When a tie line trunk is
connected, the FG terminal must be connected
to the ground. If the FG terminal is not
connected correctly, the signal may fail.
When tie lines are connected to the system, be
careful of the Tip and Ring polarity.
Summary of Contents for Univerge SV8100
Page 1: ...System Hardware Manual Issue 4 1 February 2011...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Page 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Page 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Page 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Page 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Page 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Page 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...