Issue 4.1
UNIVERGE SV8100
3 - 12
Installing the SV8100 Chassis
2.2
Floor Mounting the 19” Chassis
The CHS2U controlling and expansion chassis can be mounted on the floor
using the CHS BASE UNIT and the CHS2U JOINT BRACKET KIT.
2.2.1
CHS2U Chassis Installation
1.
Use the template shown in
Figure 3-12 Floor Mount Spacing
Guide
for required spacing before drilling holes for 0.39”
(10mm) anchor bolts (locally procured).
2.
Mark and drill the four holes required for installing the CHS
BASE UNIT.
3.
Using anchor bolts, secure the CHS BASE UNIT to the floor.
Refer to
Figure 3-13 Secure CHS BASE UNIT with Anchor
Bolts on page 3-13
for screw location.
Figure 3-12 Floor Mount Spacing Guide
Summary of Contents for Univerge SV8100
Page 1: ...System Hardware Manual Issue 4 1 February 2011...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Page 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Page 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Page 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Page 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Page 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Page 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...