Section 2
Setup and Operation
This section provides setup and operation information for the NEC Versa series system
(including cabling, power-on verification and using the Setup utility, from this point on re-
ferred to as “Setup” only).
UNPACKING THE SYSTEM
Find an area away from devices that generate strong magnetic fields (electric motors,
transformers, etc.). Place the shipping carton on a sturdy surface and carefully unpack the
system. The carton contents include the system, CD-ROM reader, modem cables, AC
adapter, AC power cord, battery, software CDs, and user documentation.
HARDWARE SETUP
When connecting power and signal cables, do the following.
NOTE:
Always plug the AC adapter cord into
an easily accessible outlet.
1.
The power switch turns the system on or off. Slide the switch right to turn it on,
slide the switch again to turn it off.
2.
Connect the AC adapter cable to the power port on right side of the NEC Versa.
3.
Plug one end of the AC power cable into the AC adapter and the other end into a
properly grounded 120- or 240-volt wall outlet.