![background image](http://html1.mh-extra.com/html/necta/sinfonia-gf6/sinfonia-gf6_user-and-maintenance-manual_3834900008.webp)
Instructions
for Installer,
Maintenance Engineer
and final User
SINFONIA
Rev. 00
H4345 - 00
02/2013
Page 8 of 41
3 INSTALLATION
3.1 Transport and Positionning
FIG. 3.1
MODEL
A
(mm)
B
(mm)
C
(mm)
WEIGHT
(Kg)
GF6-DR6
1830
860
(845)
950
290
GF9-DR9
1830 860
(845)
1220
340
GF6-DR6 packed
1830 880 960
295
GF9-DR9 packed
1830 880 1230
345
For transport and HANDLING of the vendor follow carefully the below instructions:
•
Use a transpallet/forklift having a minimun loading capacity of 400 kg., the wooden base (A) permits
to fork the vendor on 4 sides (fig. 3.1).
•
If installation is not immediate position the vendor vertically in a dry and covered area.
•
CAUTION: it is absolutely forbidden to transport and/or position the vendor in a horizontal position.
•
If the machine is
mistakenly placed in a horizontal position
, re-position it again in working
position (vertical) and
wait at least12 hours
before starting it, otherwise it would be possible to
cause damages or anomalies to the cooling unit.
•
Place the vendor in the installation area, work with caution, avoid jumps and bumps.
•
Free the machine from its packing, extract, from the back protection grill, the power cable and
carefully place it in the final position.
A
A
A
B
C