FlexPAK
12 Appendix B: Service protocol
Copy the service protocol, fill it in and save it as a service record.
NOTE!
If the results of the checks (for example, measured values) differ significantly from previous results, in-
vestigate more carefully.
Unit No.
Date:
Operating hours:
Performed by:
Control items
Result
Result
Result
Result
Previous service record
Inspect/clean outside the unit
Remove dust deposits, clean work area
Remove corrosion by grinding, apply
primer and touch up paint
Vacuum, measure negative pressure
Cooling valve
Motor bearings
Fan
Cooling fan, motor
Bearing motor/fan
Safety switch
Box/housing
Main switch
Cable harness
Electrical connection points
Ground (earth) connection
Indicator lamps
Inverter
Cooling air filter, functional control, fre-
quency inverter
Cooling air filter, exchange
Rated current
32
Summary of Contents for FlexPAK Standard
Page 6: ...FlexPAK 13 12 10 9 7 8 2 1 3 4 6 5 11 3 11 7 8 9 12 13 15 14 18 19 10 17 4 16 15 20 5 6...
Page 7: ...FlexPAK 6 1 2 3 6 7 8 9 16 15 14 13 11 10 12 4 5 7 7...
Page 9: ...FlexPAK 2 1 4 5 6 8 7 9 3 9 1 1643 1mm 65 662 1mm 26 2 1771 4 1mm 70 13mm 10 9...
Page 10: ...FlexPAK 11 12 13 14 10...
Page 11: ...FlexPAK 15 A B 16 11...
Page 12: ...FlexPAK A B C 4x 17 8x 18 12...
Page 13: ...FlexPAK A 4x B 19 Min 2 1m 83 20 1 0m 39 4 21 13...
Page 14: ...FlexPAK A B C 22 23 14...
Page 29: ...FlexPAK SUV Solenoid upper valve TVFD Twin valve feed out device 29...
Page 34: ...www nederman com...