RainTrain2
®
Start-Up & Operation
The success of the RainTrain2
®
irrigation system depends a great deal on the operator's understanding of the
proper start up procedure. Please do not attempt to operate this RainTrain2
®
. until you read and understand the
contents of this manual.
Start-up and Operation of the Raintrain2
®
.
1. Set the RainTrain2
®
. into position with the front (cable end) towards the area to be irrigated. The machine should be 40 to 50
feet inside of the beginning boundary and the wheels should be in line with the travel path and the cable anchor. The
travel path should be straight and free of any obstacles.
2. Connect the drag hose to the inlet port of RainTrain2
®
. Make sure the hose is not bound or kinked to assure proper water flow.
Check that all fittings are engaged and locked in place. See figure 11 for the proper layout of the water hoses.
Caution: Verify that the drag hose is long enough for your irrigation run! If the drag hose is drawn tight before the
RainTrain2
®
has completed it’s run, damage to the hose, the RainTrain2
®
, the anchor, the cable, or any other
piping or related equipment may occur. Spectators or operating personnel may be injured if the drag hose length
is inadequate for the irrigation run
Caution: Verify that the drag hose will be free from any obstacles during the irrigation run.
15
Figure 11. Travel Path and Hose Layout for RainTrain2
®
.
Summary of Contents for RainTrain2
Page 1: ......