NENO LEADX Ultra Manual
© NENO-CNC Schweiz 2023
Seite | 40
3.1.5 Preparation of the substructure completed.
Note that the fixed side is on the right; these brackets are all flush with the end of the profile and
fully tightened. The brackets on the left side are still movable and will later be positioned and
tightened according to the X-axis mounting.