background image

 

N11  EVK 

User  Guide 

 

Copyright © Neoway Technology Co., Ltd 

 

 

Position of UART2 pin jumper 

 

ON/OFF button 

 

GPRS antenna interface 

 

LED indicators (RING, Network, ON/OFF indicator) 

 

SIM card connector 

 

SLEEP and ON/OFF pin jumper 

2.2 Buttons and Interfaces 

The following table lists the interfaces and buttons of N11 EVB. 

Interface 

Description 

5V DC interface 

Main power supply input, 3.6 V to 4.5 V 

Power supply switch  To switch the type of main power supply 

SIM card interface 

SIM card interface 

UART1 

Commissioning, download, and power supply for N11 modules 

AT command query for N11 V2 modules 

UART2 

Log capturing for N11 

Commissioning, download, and power supply, and log capturing for N11 V2 

modules 

Antenna 

GPRS antenna 

ON/OFF 

Power on button. Hold it for 1.2 second to power on the module after power is 

supplied 

 

Summary of Contents for N11 EVK

Page 1: ...N11 EVK User Guide Issue 1 0 Date 2018 06 05 Neoway Product Document...

Page 2: ...RUCTIONS FOR CUSTOMERS TO DESIGN THEIR APPLICATIONS PLEASE FOLLOW THE RULES AND PARAMETERS IN THIS GUIDE TO DESIGN AND COMMISSION NEOWAY WILL NOT TAKE ANY RESPONSIBILITY OF BODILY HURT OR ASSET LOSS C...

Page 3: ...uide Copyright Neoway Technology Co Ltd ii Contents 1 Overview 1 2 Functions and Interfaces 2 2 1 Top View 2 2 2 Buttons and Interfaces 3 3 Power Supply 4 3 1 5V 2A Adapter 4 3 2 M5X0 PWR Board 5 4 Co...

Page 4: ...nd test engineers Change History Issue Date Change Changed By 1 0 2018 06 Initial draft Chi Cheng Conventions Symbol Indication This warning symbol means danger You are in a situation that could cause...

Page 5: ...N11 EVK User Guide Copyright Neoway Technology Co Ltd iv Related Documents Neoway_N11_Datasheet Neoway_N11_Product_Specifications Neoway_N11_AT_Command_Manual Neoway_N11_EVK_User_Guide...

Page 6: ...lications It provides various peripherial interfaces including power supply UART SIM card antenna and ON OFF Customers can perform commissioning after connecting to the power supply and UART N11 EVK i...

Page 7: ...y Co Ltd 2 Neoway Confidential 2 Functions and Interfaces 2 1 Top View The components marked in red are respectively N11 module 5V DC input adapter power supply Switch for main power supply UART1 UART...

Page 8: ...11 EVB Interface Description 5V DC interface Main power supply input 3 6 V to 4 5 V Power supply switch To switch the type of main power supply SIM card interface SIM card interface UART1 Commissionin...

Page 9: ...wing two types of power supply M5X0 PWR 5V 2A DC adapter 3 1 5V 2A Adapter The EVB uses 5 V power supply Plug the output end of the adapter to the DC connector on the EVB Pull the power supply switch...

Page 10: ...n a sequence of red black yellow and green at one end and should be inserted into the plug of the EVB at the other end There are two pins on the power board and they can control the power supply of th...

Page 11: ...PWR board and the computer displays Profile USB to Serial Comm Port under the Port COM and LPT1 node in Device Manager Then you can start the commissioning Step 2 Supply power to the module and start...

Page 12: ...y Technology Co Ltd 7 Through 5V DC adapter Connect the adapter to the EVB and plug it into a power board Push the switch to the DC5V side and remove the jumper cap of UART1 Hold the ON OFF button for...

Page 13: ...N11 EVK User Guide Copyright Neoway Technology Co Ltd 8 Step 3 Start the commissioning tool and perform commissioning...

Reviews: