Step 1 - Position the SK VAP Evaporative Module
Installation should only take place after careful consideration of final position of the SK VAP Evaporative module and
SK VAP Control panel and should be in accordance with AHU/duct-work installation diagram below.
Always discuss the position of the SK VAP module with your representative!
The following points must be considered
a -
The AHU / duct-work floor must be designed with a loading capacity capable of supporting the humidifier’s weight
when wet, as the largest unit will weigh 1016 lb (461kg) when in operation - see back of this manual for weights
and measures.
b -
Caution: The SK VAP system must be installed within a waterproof AHU section.
A drain pan with
provision for running water to waste should be installed within the humidification section to allow
for wetting that might occur during installation, commissioning,operation or servicing. Where drain
pans are required to drain under gravity, ensure that the drains are trapped and primed and have
enough head to overcome the pressure of the system and for hygiene reasons completely drain
down. On commissioning the system, drainage of the humidification section should be tested. The
drain pan MUST drain fully and should be accessible for cleaning and disinfection as part of
routine maintenance of the system.
c -
The Module must be positioned on a minimum height 2” (50 mm) up-stand or runners to allow for drain
pipe-work installation and removal of the tank and cassettes through the side of the AHU if required.
d -
Provisions should be made for the water inlet, drain pipe-work and interconnecting electrical cable to exit through
the side of the AHU
e -
Side access through a door (preferably such that the cassettes may be pulled through for maintenance) should
always be provided and a minimum of 24” (600mm) access front and rear of system for inspection,
commissioning and maintenance.
f -
A perforated plate (60/40) should be installed upstream in cases where the air flow is uneven.
Very important: Use a level to make sure that the unit is level front to back and across the width when
installed. Failure to observe this point could result in flooding of the AHU / duct.
2” (50mm
Upstand
Air Flow
24” (600mm)
Minimum
Access
24” (600mm)
Minimum
Access
Summary of Contents for SK VAP
Page 4: ...4 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 17: ...17 Neptronic Evaporative Humidification Cooling System www neptronic com Wiring Diagram...
Page 18: ...18 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 19: ...19 Neptronic Evaporative Humidification Cooling System www neptronic com...
Page 20: ...20 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 21: ...21 Neptronic Evaporative Humidification Cooling System www neptronic com...
Page 22: ...22 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 34: ...34 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 35: ...35 Neptronic Evaporative Humidification Cooling System www neptronic com...