12
Neptronic
®
www.neptronic.com
Evaporative Humidification / Cooling System
Step 2 - Install Blanking Plates
Once the SK VAP Evaporative Module has been positioned in the waterproof section of air handling unit, non corrosive
blanking plates (not supplied) must be installed to prevent air bypass around the Module in the AHU.
Typical blanking plate arrangement shown below.
Blanking
Plate
(Not supplied)
AHU Wall
Minimum 2” (50 mm) Box
support upstand
(Not supplied)
Summary of Contents for SK VAP
Page 4: ...4 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 17: ...17 Neptronic Evaporative Humidification Cooling System www neptronic com Wiring Diagram...
Page 18: ...18 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 19: ...19 Neptronic Evaporative Humidification Cooling System www neptronic com...
Page 20: ...20 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 21: ...21 Neptronic Evaporative Humidification Cooling System www neptronic com...
Page 22: ...22 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 34: ...34 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 35: ...35 Neptronic Evaporative Humidification Cooling System www neptronic com...