Step 4 - Install Drain Pipework
The SK VAP Evaporative Module features an integrated drain and overflow which must be connected to the main
building drain with 3/4” (20mm) copper or stainless pipework. The drain assembly can be reversed to face in the
opposite direction to suit either left or right feed pipe-work. This drain assembly should be connected to the main building drain
via the 3/4” (20mm) connection. Drain line must be directed to an open drain. No drain trap is required. Risk of return from
main drain to overflow.
1
5
1
2
5
6
8
Drain pump
Integrated Overflow
3/4” (20mm) Drain Plumbing
(Not supplied)
3/4” (20mm) Tee
Summary of Contents for SK VAP
Page 4: ...4 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 17: ...17 Neptronic Evaporative Humidification Cooling System www neptronic com Wiring Diagram...
Page 18: ...18 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 19: ...19 Neptronic Evaporative Humidification Cooling System www neptronic com...
Page 20: ...20 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 21: ...21 Neptronic Evaporative Humidification Cooling System www neptronic com...
Page 22: ...22 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 34: ...34 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 35: ...35 Neptronic Evaporative Humidification Cooling System www neptronic com...