15
Neptronic
®
Evaporative Humidification / Cooling System
www.neptronic.com
Step 5 - Position the SK VAP Control panel
The SK VAP Control panel should ideally be positioned as close to the Evaporative Module as possible for ease of
servicing and maintenance.
Use a 9-core electrical inter-connecting cable with a maximum length of 33ft (10m) for connection between the SK VAP
Evaporative Module and the SK VAP Control Panel (see “Wiring Diagram” on page 17).
The SK VAP Control panel must have an electrical disconnect switch (not supplied) fitted within 39” (1m) for purposes of
maintenance and emergencies.
Electrical Power
Isolator (Not supplied)
SK VAP
Control panel.
Inter-connecting 9 core
cable between the
Evaporative Module and
the Control panel.
Caution: Ambient Conditions:
Temperature
40-110ºF (5-45ºC)
Humidity <85%
rH
NB: Ensure that the SK VAP
Control panel is accessible
for maintenance.
13” (330mm)
16
”(
40
6m
m
)
Fixing Part 1
Fixing Part 2
Clearance dimensions
10”
(250mm)
4”
(100mm)
4”
(1
00
m
m
)
4”
(1
00
m
m
)
Summary of Contents for SK VAP
Page 4: ...4 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 17: ...17 Neptronic Evaporative Humidification Cooling System www neptronic com Wiring Diagram...
Page 18: ...18 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 19: ...19 Neptronic Evaporative Humidification Cooling System www neptronic com...
Page 20: ...20 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 21: ...21 Neptronic Evaporative Humidification Cooling System www neptronic com...
Page 22: ...22 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 34: ...34 Neptronic www neptronic com Evaporative Humidification Cooling System...
Page 35: ...35 Neptronic Evaporative Humidification Cooling System www neptronic com...