SK300-XL Steam Humidifier
10
Stage 2 – Steam Distribution Installation
Selection of
Multi-Steam
1.
For all Multi-Steam units use the Neptronic® Humidisoft program to size the
unit.
2.
Where two Multi-Steam units are required, duties in excess of 528lb/h (240kg/h)
make your selection using the following rules:
Divide the air volume flow in half.
Divide the AHU / air Duct
width
in half.
Height
of the duct must remain at 100% its height.
This will size Multi-Steam units so that they can be placed side by side.
3.
For installation of Multi-Steam units please refer to Neptronic® Multi-Steam
Installation Instructions
Horizontal duct (Fig. 9)
dimensions in bracket are in mm
Vertical duct (Fig. 10)
dimensions in bracket are in mm
ؽ'’ (15)
Static pressure
+ 2'’ (50)
Min.
50
mm
Min. 2'’ (50)
Min. 2'’ (50)
Mounting bracket must be level horizontally
Steam supply hose or
rigid pipe to Humidifier
Header must be pitched toward condensate drain
Condensate drain pipe to steam trap
Air duct
Rod, bolt, nut and
washer assembly
Static pressure
+ 2'’ (50)
Min. 10º
Steam supply hose or
rigid pipe to Humidifier
Header must be pitched toward condensate drain
Air duct
Rod, bolt, nut and
washer assembly
Ai
r flow
Air f
low