SK300-XL Steam Humidifier
6
Handling & Unpacking
Lifting or handling MUST only be carried out by trained and qualified personnel. Ensure
that the lifting operation has been properly planned, risk assessed and that all
equipment has been checked by a skilled and competent Health & Safety
representative and effective control measures put in place.
It is the customer’s responsibility to ensure that operators are trained in handling heavy
goods and to enforce the relevant lifting regulations.
Refer to Dimensions & Weight section for system dry weights.
Handling and
Lifting
The SK300-XL Steam Humidifier MUST always be handled and lifted with care and
should remain in its original packaging for as long as possible prior to installation
The SK300-XL Steam Humidifier package may be carried using a forklift from the
underside. Caution should be exercised to ensure balanced load before lifting.
Lifting sling angle should be greater than 30˚ to the horizontal.
Unpacking
SK300-XL Steam Humidifier is shipped on a wooden crate.
Remove packing wooden crate and skids prior to installation.
List of
accessories
supplied
Standard enclosure
2 sets of keys.
2 adjustable steam hose collars per
steam outlet.
The present
Installation Instructions
.
Wiring diagram
affixed onto the interior of the electrical compartment door.
!