SK300-XL Steam Humidifier
7
Installation Overview
All installation work must comply with local regulations.
All work related to the installation of the SK300-XL Steam Humidifier MUST
only be performed by skilled and qualified technical personnel (e.g. qualified
gas installer, fitters, electricians, plumbers or technicians with appropriate
training).
The customer is responsible for ensuring their suitability.
For the installation of the SK300-XL Steam Humidifier and associated
components there should be no special tooling requirements above that of a
fitter’s toolkit.
Installation method
statement
Stage1: Unit Positioning and Mounting
Stage 2: Steam Distribution Installation
Stage 3: Water Supply Installation
Stage 4: Water Drain Connection
Stage 5: Electrical Supply and Installation
Stage 6: Electrical Control Connections
(Fig. 4)
!
Stage 5
Stage 2
Stage 1
Water
supply
Stage 4
Stage 3
Stage 6
SK 300
-XL