SKE Steam Humidifier
Installation Instructions and User Manual
30
11. Start-up procedure
We recommend to strictly following this start-up procedure in order to avoid any anomaly resulting from wrong
cleaning of the components.
In case of problem or discrepancy see section 14
– Troubleshooting guide.
1. Make sure that mechanical, electric and plumbing connection are done and secured.
2. Make sure that low voltage control circuit is done and correct.
3. Turn on the water shut off valve (outside of the humidifier) and check that the drain connections are
connected to the main drain line of sufficient diameter.
4. Turn on the power to the humidifier from the circuit breaker disconnect. The POWER indicator should go on.
5. Push the TEST button located on the main pc. Board. This pc. Board is located in the electrical
compartment.
6. This will start up a pre-programmed start-up cycle. This start-up cycle will test functions of the humidifier and
will flush out any dirt in the humidifier and supply lines.
This cycle will last about 1 hour.
Note:
a) The front panel rocker switch will not affect the performance of the start-up cycle.
b) In the case of modulating humidifier, there must be a demand signal of at least 50% for the start-up cycle
to operate correctly.
c) To bypass at any time the start-up cycle and to proceed directly into normal operation, press the RESET
button located on the main pc. board.
7. The front panel rocker switch may be left in the AUTO position during the start-up cycle. This will result in
normal operation of the humidifier as soon as the start-up cycle is finished.
8. Your humidifier is now fully operational.