SKE-XL Steam Humidifier
Installation Instructions and User Manual
9
Stage 1 – Unit Positioning and Mounting
General
considerations
Any installation work MUST be carried out by suitably qualified personnel.
The following considerations should be taken into account before deciding on the
location for the SKE-XL Steam Humidifier:
Plan a location easy to access in order to permit an easy inspection and
servicing of the humidifier.
Do not install humidifier where failure of the appliance could cause damage
to the building structure or to costly equipment.
Location area should be well ventilated, ambient temperature should not
exceed 30
˚C.
Positioning the
Humidifier
The humidifier must be installed to ensure the steam hose length is kept to the
shortest possible length.
For flexible steam hose: the total steam line length should not exceed 5
meters. For longer distances use insulated hard piping.
For insulated hard piping: the total steam line length should not exceed 15
meters. For longer steam line runs, consult factory.
Observe the minimum access distances as shown in Illustration 5.
(Illus. 5) Standard enclosure
Minimum
Clearances
Minimum clearances are :
Top: 510mm minimum
Electrical panel side: 600mm minimum
Front: 800mm minimum
The humidifier is designed to be installed directly on the floor.
Provide a level, solid foundation for the humidifier.
Ensure that the floor beneath the humidifier is water proof to withstand any water
spillage during servicing or if a problem occurs.
The humidifier is provided with adjustable legs in order to ensure proper level.
!
510 mm
minimum
800
mm
min
imu
m
600 m
m
minimu
m