SKE4-E Steam Humidifier
Installation Instructions and User Manual
Page | - 12 -
Positioning
x
Ensure that the front panel, the left side (plumbing compartment) and the right side
(electrical compartment) are accessible in order to permit servicing.
x
Leave a clearance of at least 1.2 m to the front panel and 0.3 m on the left and right sides
of the humidifier.
x
Leave a clearance of at least 0.5 m on top of the humidifier.
For models SKE4-E05 to E80:
o
Mount the humidifier at a minimum height of 0.6 m above floor level.
o
Leave a clearance of at least 0.25 m under the humidifier for installation of water
supply, drain piping and electrical connections.
For models SKE4-E90 to E120:
o
These models are designed to be installed directly on the floor. Adjustable legs
are provided in order to ensure proper level.
o
Provide a level, solid foundation and ensure that the floor beneath the humidifier
is water proof to withstand any water spillage during servicing or in the event of a
problem.
Illustration 6 - Positioning the Humidifier