SKE4-E Steam Humidifier
Installation Instructions and User Manual
Page | - 16 -
Positioning - Humidifier with SDU
x
The SDU must be installed in an environment where the air is relatively clean. This will
prevent the blower from getting clogged with dust.
x
The humidifier must be mounted such that the SDU fan section is at least 2 m above the
floor.
x
Allocate a minimum clearance of 0.45 m from the ceiling to avoid ceiling and wall
condensation.
x
If additional ventilation is not present, ensure that the fan has a clearance of at least 1.35
m from the ceiling. Proper ventilation must be observed to avoid ceiling and wall
condensation.
Illustration 11 - SDU Mounted on Humidifier
Maintenance of the SDU
Clean the blower if there is an accumulation of dust.