SKG3 Gas Fired Humidifier
Installation Instructions and User Manual
9
Handling & Unpacking
Lifting or handling MUST only be carried out by trained and qualified personnel.
Ensure that the lifting operation has been properly planned, risk assessed and that all
equipment has been checked by a skilled and competent Health & Safety
representative and that effective control measures have been put in place.
It is the customer’s responsibility to ensure that operators are trained in handling heavy
goods and that all relevant lifting regulations are enforced.
Refer to Dimensions & Weight section for system dry weights.
Handling and Lifting
The SKG3 Steam Humidifier MUST always be handled and lifted with care and must
remain in its original packaging for as long as possible prior to installation
The SKG3 Steam Humidifier package may be carried using a forklift from the
underside. Caution must be exercised to ensure balanced load before lifting.
Lifting of SKG3 Steam Humidifier MUST ALWAYS be done using the appropriate
Neptronic Lifting Bracket (sold separately).
Lifting sling angle must be greater than 30
˚ to the horizontal.
Optional weather proof enclosure is provided with four (4) lifting eyelets located at
each corner on the top of the enclosure, see fig. 10.
Standard enclosure lifting bracket - Fig. 9
Weather proof enclosure point for lifting - Fig. 10
Unpacking
SKG3 Steam Humidifier is shipped on a wooden crate.
Remove packing wooden crate and skids prior to commissioning.
List of Accessories
Supplied
Standard enclosure
Weather proof enclosure
2 sets of keys.
2 adjustable steam hose collars per
module to connect to connect on the
steam output.
2 adjustable steam hose collars
per internal steam manifold.
Startup check list & Combustion field adjustment instructions.
The present
Installation Instructions and User Manual
.
Wiring diagram
affixed onto the interior of the front access door.
Service and troubleshooting guide
.
BACnet® communication module user guide
(if BACnet® option is installed).
!
4 lifting eyelets