SKG3 Gas Fired Humidifier
Installation Instructions and User Manual
21
Stage 4 – Water Supply Installation
Water supply installation must conform to local codes and regulations.
Any installation work must be carried out by suitably qualified personnel.
Water Inlet
Specifications
The Neptronic® SKG3 Humidifier is designed to be used with tap, reverse
osmosis, de-ionized and de-mineralized water.
Maximum water supply pressure: 10 to 70psig (70 to 480kPa)
Minimum water temperature: 49
˚F (+4˚C)
Maximum water temperature:
104˚F (+40˚C)
Model
Water inlet
Connection size
SKG3-110 to 810
Ø1/2
’’ NPT (15mm)
Male
Water Supply Line
Installation
To facilitate servicing, a shut off valve (not supplied) must be installed on the
water line, within
40’’ (1m) of the humidifier.
It is recommended to install a water hammer arrestor, in order to absorb
hydraulic shock and minimize water hammer when the fill valve closes.
Water supply connection - Fig. 31
!
SKG3
Water Inlet connection
¼ turn Shut off Valve
Flexible Hose
Feed Water supply line
Gasket
Gasket