SKG3 Gas Fired Humidifier
Installation Instructions and User Manual
16
Stage 2
– Steam Distribution Installation
Steam Pipe Work to Duct Connections (SKG3-110 to 210)
SKG3-110
Steam distribution manifolds
(S.A.M.E2)
minimum lenght = 35'
’ (900)
Ø3'
’ (76)
ؽ'
’ (15)
Min. 7° pipe slope
Min. 4'’ (100)
Insulated pipe
H
Air Duct
Static pr
2'’ (50)
Min. 2/5 H
Steam pipe work SKG3-110, SAM - Fig. 22
(dimensions in bracket are in mm)
A single Ø
3’’ (76mm) feed pipe must be connected to two (2) S.A.M.E2 steam manifolds
with a suitable reduction at the lowest point to allow a Ø
½’’ (15mm) condensate drain from
the main steam supply.
SKG3
155, 180, 210
Min. 7° pipe slope
Ø3'
’ (76)
ؽ'
’ (15)
Steam distribution manifolds
(S.A.M.E2)
minimum lenght = 35'
’ (900)
Min. 4'’ (100)
Insulated pipe
H
Air Duct
Static pr
2'’ (50)
Min. 1/3 H
Steam pipe work SKG3-155 to 210, SAM - Fig. 23
(dimensions in bracket are in mm)
A single Ø
3’’ (76mm) feed pipe must be connected to 3 S.A.M.E2 steam manifolds with a
suitable reduction at the lowest point to allow a
ؽ’’ (15mm) condensate drain from the
main steam supply.
All manuals and user guides at all-guides.com