SKG4-E Gas Fired Humidifier
Installation Instructions and User Manual
Page | - 29 -
Stage 4 - Water Supply Installation
Water supply installation must conform to Local and National Codes.
Any installation work must be carried out by suitably qualified personnel.
Water Inlet Specifications
The SKG4 humidifier is designed to be used with tap, reverse osmosis and deionised water.
For normal operation, pre-treatment of water is not necessary.
As the humidifier is equipped with the Neptronic Anti-Foaming Energy Conservation (AFEC)
system, which drains the humidifier in the presence of foam to ensure clean and safe
operation, the use of softened water is not recommended.
If a third party requires a water softener for any operational or equivalency purposes, ensure
that the water dilution feature is enabled. To enable this function, configure the value of the
BlowdownRate
setting located in the
Installation
menu (see page 55 for details).
Water Inlet Specifications:
o
Maximum water supply pressure: 70 to 480kPa
o
Minimum water temperature:
4˚C
o
Maximum water temperature:
40˚C
Water Supply Line Installation
To facilitate servicing, a shut off valve (not supplied) must be installed in the water line, within
1 meter of the humidifier.
It is recommended to install a water hammer arrestor, in order to absorb hydraulic shock and
minimize water hammer when the fill valve closes.
Model
Water Inlet Connection Size
SKG4-EXXXX
Ø15mm Male
Summary of Contents for SKG4-E Series
Page 70: ...Notes ...
Page 71: ......