SKG4-E Gas Fired Humidifier
Installation Instructions and User Manual
Page | - 24 -
Multi-Steam System
Selection of Multi-Steam System
For all Multi-Steam units, use the Neptronic Humidisoft program to size the unit.
Where two Multi-Steam units are required (duties in excess of 300kg/h), make your selection
using the following rules:
o
Divide the air volume flow in half.
o
Divide the AHU / air duct
width
in half.
o
Height
of the duct must remain at 100% its height.
o
This will size the Multi-Steam units so that they can be placed side by side.
For installation of Multi-Steam units, refer to the Neptronic Multi-Steam Installation
Instructions.
ؽ" (15mm)
Static pressure
+ 2" (51mm)
M
in
. 2
"
(5
1
m
m
)
Min. 2" (51mm)
Min. 2" (51mm)
Mounting bracket must be level horizontally
Steam supply hose or
rigid pipe to Humidifier
Header must be pitched toward condensate drain
Condensate drain pipe to steam trap
Air duct
Rod, bolt, nut and
washer assembly
Illustration 21 - Multi-Steam (Horizontal Duct)
Condensate drain pipe to steam trap
Static pr
2" (51mm)
Min. 10°
Steam supply hose or
rigid pipe to Humidifier
Header must be pitched toward condensate drain
Air duct
Rod, bolt, nut and
washer assembly
A
ir
f
lo
w
A
ir
f
lo
w
Illustration 22 - Multi-Steam (Vertical Duct)
Summary of Contents for SKG4-E Series
Page 70: ...Notes ...
Page 71: ......