Start-up Procedure 

 

Initial verification and start-up must be carried out by suitably qualified personnel. 

It  is  strictly  recommended  to  follow  this  start-up  procedure  in  order  to  avoid  any  anomaly  resulting  from  inaccurate 
installation of the components.  

Initial Verification 

Clearance 

1.  Ensure that the humidifier cabinet is installed in a location in which the humidifier 

can be serviced correctly. 

 

Electrical Supply 

2.  Verify that  the  power supply  (voltage) conforms to the appliance  name plate on 

the side of the humidifier. 

 

3.  Confirm  that  24Vac  is  present  between  terminals  TB4  1&2  on  the  control 

connection PCB. Remove the front top cover to get to this PCB. 

 

Water Supply 

4.  Ensure  that  water  is  supplied  to  the  humidifier  and  that  a  shut-off  and  a  non-

return valve are placed outside the humidifier. 

 

5.  With  the  water  shutoff  valve  turned  on,  check  that  the  drain  connections  are 

connected  to  the  main  drain  line  with  sufficient  diameter.  Ensure  that  there  are 
no apparent leaks. 

 

6.  Confirm  that  the  drain  piping  is  properly  connected  with  a  pitch  of  at  least 

¼” 

(6.5mm) per foot (300mm) horizontal run. 

 

Steam 

7.  Verify that the steam distributors are properly installed into the ventilation duct. 

 

8.  Verify that the flexible steam hoses and rigid steam supply pipes are shorter than 

16ft (5 m) in total, are properly sloped and have condensation 

“S” traps wherever 

required. 

 

Gas Supply 

9.  Confirm that a proper regulator and gas test point have been installed on the gas 

line to the humidifier. 

 

10.  Confirm that gas is supplied to the humidifier and that the shut-off valve located 

outside  the  humidifier  is  closed.  With  the  shut-off  valve  is  turned  on,  check  for 
leaks, gas, smell or hissing sounds. 

 

Flue Gas Venting 

11.  Verify that the flue gas venting is as follows: 

a)  Ensure that a tee is installed with a drain trap for the flue gas condensate. 
b)  Check that all connections are air tight.  
c)  Ensure that the total length of the flue gas venting pipe is no longer than 

100ft (30 meters). 

d)  An approved venting system is used, such as one of the following: 

 

Chiminee Lining HEP, HEPL or HEPL2 rigid venting system, or  

 

Flexmaster Z-Vent Model SVE Series III rigid venting system, or 

 

DuraVent FasNSeal (single-wall) or FasNSeal W2 (double-wall) 
venting system, or 

 

Magnaflex’s PV model insulated flexible venting system, or 

 

Selkirk/HeatFab Saf-T Vent Model single-wall or double-wall venting 
system, or 

 

Other approved system, please specify (for reference) __________ 
_____________________________________________________  

Note: Aluminum B vent is not acceptable

 

 
 

 

 

 

 

 

Controls 

12.  Ensure that the Airflow switch is properly installed and connected to the printed 

circuit  board.  If  an  Airflow  switch  is  not  used,  verify  that  a  jumper  is  connected 
between terminals TB3 1&2. 

 

13.  Ensure that the High limit duct humidistat is properly installed and connected to 

the  printed  circuit  board.  Verify  that  the  setpoint  is  properly  adjusted.  If  a  High 
limit  duct  humidistat  is  not  used,  verify  that  a  jumper  is  connected  between 
terminals TB3 1&3. 

 