SKGE3 Gas Fired Humidifier
Installation Instructions and User Manual
13
Stage 1
– Unit Positioning and Mounting
Standard enclosure clearances - Fig. 12
Weather proof enclosure clearances - Fig. 13
Minimum
Clearances
Minimum clearances are :
Standard enclosure
Weather proof enclosure
Top: 0.50m minimum
Both sides: 0.60m minimum
Front: 0.50m minimum
Top: 0.50m minimum
Connection side: 0.60m minimum
Front: 0.8m minimum
Note: Above minimum clearances are indicated for inspection and servicing access.
The SKGE3 Steam Humidifier is designed for 0 clearance to combustible materials,
except on top and front, where minimum clearances to combustible materials is
respectively 500 and 762 mm.
The humidifier is designed to be installed directly on the floor.
Provide a level, solid foundation for the humidifier.
Ensure that the floor beneath the humidifier is water proof to withstand any water
spillage during servicing or if a problem occurs.
The humidifier is provided with adjustable legs in order to ensure proper level.
Roof Curb for
Weather Proof
Enclosure
Weather proof enclosure base dimensions(in mm) - Fig. 14
Ensure that roof curb is structurally built to support the weight of the SKGE3
humidifier.
Roof curb must provide proper level to the humidifier.
The base of the weather proof enclosure is provided with 4 holes Ø12mm to bolt the
SKGE3 humidifier to the roof curb.
500mm
minimum
800mm
minimum
600mm
minimum
0.6
m
min
im
um
0
.5
m
m
in
im
u
m
0.
8m
m
ini
m
um
4 holes (Ø 12)
to bolt
humidifier to
roof curb.
16
102
61
0
30
5
1/2
xU
U
U -
204
All manuals and user guides at all-guides.com