SKGE3 Gas Fired Humidifier
Installation Instructions and User Manual
16
Stage 2
– Steam Distribution Installation
Selection of
Steam
Distribution
Manifolds
1.
The minimum steam manifold length that can be used with the SKGE3-0501 to
SKGE3-1001 is 900mm. Any manifold below this dimension will have insufficient
outlet spigots to allow proper steam distribution.
2.
If duct size is below a width of 900mm, it will be necessary to either fit multiple
pipes or use a Multi-Steam system.
Horizontal Duct
Horizontal duct
– 2 manifolds - Fig. 18
Horizontal duct
– 3 manifolds - Fig. 19
Vertical Duct
Vertical duct
– 2 manifolds - Fig. 20
Vertical duct
– 3 manifolds - Fig. 21
H
2
/5
H
120 mm
1
2
0
m
m
Ø 78 mm
1
/5
H
200 mm
air flow
Air duct
H
1
/3
H
120 mm
1
2
0
m
m
Ø 78 mm
1
/6
H
250 mm
air flow
Air duct
250 mm
1
/2
H
W
min. 600 mm
1/2 H
1/4 H
1/4 H
M
in
.
1
0
0
m
m
Air duct
W
min. 900 mm
1/3 H
1/3 H
1/6 H
1/6 H
M
in
.
1
0
0
m
m
Air duct
All manuals and user guides at all-guides.com