Evaporative Cooling Humidifier
Installation Instructions and User Manual
www.neptronic.com
Page | 5
Installation Overview
WARNING: Failure to observe manufacturer's installation recommendations will invalidate the
manufacturer’s warranty.
Local Regulations
Lifting or handling MUST be carried out by trained and qualified personnel. Ensure that the lifting
operation has been properly planned, assessed for risk and that the equipment has been checked by
a competent Health & Safety representative, and that effective control measures are in place.
It is the customer’s responsibility to ensure that the operators are trained in handling heavy goods and
to enforce the relevant lifting regulations.
The
Evaporative Cooling Humidifier MUST always be handled and lifted with care and should remain
in its original packaging for as long as possible prior to installation.
The
Evaporative Cooling Humidifier
package may be carried using a forklift from the underside.
Caution should be exercised to ensure a balanced load before lifting.
List of Supplied Accessories
Water supply stainless steel reinforced hose 24" (600mm) along with 1/2’’ NPT (13mm) female hose
connection.
Water filter assembly, 5 microns PP pre-filter and silver ion dosing anti bacterial cartridges.
Installation Instructions and User Manual
!
!