26
27
NC-1000 -
installation manual
26
27
6. The installations of the patch cords
The following installation cases are described in the next chapters:
Patch cord installations into the NC-1000 patch panels
•
Patch cord installations inside the NC-1000 frame between patch panels
•
Patch cord installations between the NC-1000 frame and equipment racks
•
Patch cord installations between the NC-1000 frames
•
6.1 Patch cord installations into the NC-1000 patch panels
Bring the patch cords directly to the patch panels without threading through any fibre guides and
•
connect them to the adapters after cleaning (using e.g. a cleaning cassette)
After connections guide the patch cords to the right or left to the cabling space of the frame according to
•
the instructions in the chapters 5.2 and 5.3.
If you have to make or change connections in fully loaded patch panels, the handling of the connectors
•
and specially disconnecting of the connectors can be quite difficult. For these cases Nestor Cables
can deliver special tools for handling very common SC type connectors, product code LV1256, see
pictures below.
6.2 Patch cords inside the NC-1000 frame
Take the patch cords to the right side of the turnable inner frame.
•
Guide the patch cords through the right side guides of the panels and to the front part of the cabling
•
space of the inner frame.
Bring the patch cord loops in the cabling space of the inner frame around the nearest guide to keep
•
them in order.