1.
INSTALLATION
The complete installation must be carried out with due reference to the Standards and local Codes. It should be
noted that the requirements and these publications may be superseded during the life of this manual.
We recommend the installation of the stove is carried out by suitably qualified persons working to the local Codes
and rules which are current at the time of installation.
MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS
Measurement
(mm)
A
B
C
D
E
F
G
H11 / S21
450
300
200
250
300
300
300
S31
450
300
200
300
300
300
300
S41 / H41
450
400
200
300
400
400
400
The measurements given are for advice only. In all installations surrounding flammable materials must not exceed
80°C. The stove must always stand perfectly level and have sufficient space allowed for service work. These
clearances can be reduced by:
A.
Using heat shield as listed in AS/NZS2918:2001 or AS1691:1985
B.
Using a sheet metal spacing 22 mm from the wall, clearances may be reduced by 50%.
Our oil stoves do not require the use of floor protection.
SEISMIC RESTRAINTS
The stove must be fixed to the floor using two heavy wood screws (for a
wooden floor) or 2.5 mm Dynabolts or similar device, for a concrete floor.
The restraints should be fitted through the holes in two diagonally
opposite feet.
Corner installations
45
ᵒ
F
G
Summary of Contents for H11
Page 1: ...MAZOUT OLIE OIL MODE D EMPLOI GEBRUIKSAANWIJZING INSTALLATION AND OPERATING INSTRUCTIONS ...
Page 2: ...C07100DC023 1 ...
Page 52: ...C07100DC023 51 FLUE CONNECTION IDEAL TO BE AVOIDED ...
Page 53: ...C07100DC023 52 IDEAL TO BE AVOIDED ...
Page 56: ...C07100DC023 55 ...
Page 76: ...C07100DC023 75 ...
Page 77: ...C07100DC023 76 SOTO DE LA MARINA CANTABRIA Apdo de correos 208 SANTANDER C07100DC023 04 2017 ...