UIM-2T1
T1 Loop Bonding Uplink Interface Module
1.0 INSTALLATION
1.1 Unpack and Inspect the Equipment
The following components should be included:
z
1
UIM-2T1
z
4
#6 Phillips Panhead Nylon Locking Screws
z
2
#6 Phillips Beige Flathead Screws
If there is any visible damage, do not attempt to connect the device. Contact Customer Support at 1-
877-638-2638 (1-603-427-0600 for international customers) or
support@nettonet.com
.
1.2 Configure the T1 Ports
The T1 Configuration Switches for both Port 1 and Port 2 are on the component side of the UIM-2T1
circuit board, opposite the faceplate/label. When facing the Configuration Switches, Port 1 switches
are on the left and Port 2 switches are on the right. Switches for both ports are numbered from left
to right, #1-8.
Installation Instructions
C
AUTION
Net to Net Technologies strongly recommends the use of proper electrostatic discharge (ESD) precautions when
handling this equipment.
N
OTE
Port 2 Configuration Switches on the UIM-2T1 are NOT USED: frame type, line code and line attenuation for
Port 2 are determined by the Port 1 switch settings. BOTH ports determine speed and timing configurations via
communication with the remote T1 equipment to which the UIM-2T1 is connected.
PORT 1 SWITCHES
Switch #
Configuration
Switch #
Configuration
1
not used
5
LINE ATTENUATION
2
not used
6
3
FRAME TYPE
7
not used
4
LINE CODE
8
not used
220-0000084 rev 01