Step 2: Run system-level diagnostics
After installing a new chassis, you should run interconnect diagnostics.
Your system must be at the LOADER prompt to start System Level Diagnostics.
All commands in the diagnostic procedures are issued from the node where the component is being replaced.
1. If the node to be serviced is not at the LOADER prompt, perform the following steps:
a. Select the Maintenance mode option from the displayed menu.
b. After the node boots to Maintenance mode, halt the node:
halt
After you issue the command, you should wait until the system stops at the LOADER prompt.
During the boot process, you can safely respond
y
to prompts:
2. Repeat the previous step on the second node if you are in an HA configuration.
Both controllers must be in Maintenance mode to run the interconnect test.
3. At the LOADER prompt, access the special drivers specifically designed for system-level diagnostics to
function properly:
boot_diags
During the boot process, you can safely respond
y
to the prompts until the Maintenance mode prompt (*>)
appears.
4. Enable the interconnect diagnostics tests from the Maintenance mode prompt:
sldiag device modify
-dev interconnect -sel enable
The interconnect tests are disabled by default and must be enabled to run separately.
5. Run the interconnect diagnostics test from the Maintenance mode prompt:
sldiag device run -dev
interconnect
You only need to run the interconnect test from one controller.
6. Verify that no hardware problems resulted from the replacement of the chassis:
sldiag device status
-dev interconnect -long -state failed
System-level diagnostics returns you to the prompt if there are no test failures, or lists the full status of
failures resulting from testing the component.
7. Proceed based on the result of the preceding step.
130
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...