• You must have installed the shelves, powered them on, and set the shelf IDs.
Install a drive shelf for a hot-add
Steps
1. If you are hot-adding one shelf using one set of RoCE capable ports (one RoCE capable I/O module) on
each controller module, and this is the only NS224 shelf in your HA pair, complete the following substeps.
Otherwise, go to the next step.
This step assumes that you installed the RoCE capable I/O module in slot 3, instead of slot
7, on each controller module.
a. Cable shelf NSM A port e0a to controller A slot 3 port a.
b. Cable shelf NSM A port e0b to controller B slot 3 port b.
c. Cable shelf NSM B port e0a to controller B slot 3 port a.
d. Cable shelf NSM B port e0b to controller A slot 3 port b.
The following illustration shows cabling for one hot-added shelf using one RoCE capable I/O module in
each controller module:
1502
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...