2. If you are hot-adding one or two shelves using two sets of RoCE capable ports (two RoCE capable I/O
modules) in each controller module, complete the applicable substeps.
Shelves
Cabling
Shelf 1
These substeps assume that you are beginning the cabling by
cabling shelf port e0a to the RoCE capable I/O module in slot 3,
instead of slot 7.
a. Cable NSM A port e0a to controller A slot 3 port a.
b. Cable NSM A port e0b to controller B slot 7 port b.
c. Cable NSM B port e0a to controller B slot 3 port a.
d. Cable NSM B port e0b to controller A slot 7 port b.
e. If you are hot-adding a second shelf, complete the “Shelf 2” substeps;
otherwise, go to step 3.
Shelf 2
These substeps assume that you are beginning the cabling by
cabling shelf port e0a to the RoCE capable I/O module in slot 7,
instead of slot 3 (which correlates with the cabling substeps for
shelf 1).
a. Cable NSM A port e0a to controller A slot 7 port a.
b. Cable NSM A port e0b to controller B slot 3 port b.
c. Cable NSM B port e0a to controller B slot 7 port a.
d. Cable NSM B port e0b to controller A slot 3 port b.
e. Go to step 3.
The following illustration shows cabling for the first and second hot-added shelves:
1503
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...