• You must have installed the shelves, powered them on, and set the shelf IDs.
Install a drive shelf for a hot-add
Steps
1. If you are hot-adding one shelf using one set of RoCE capable ports (onboard RoCE capable ports) on
each controller module, and this is the only NS224 shelf in your HA pair, complete the following substeps.
Otherwise, go to the next step.
a. Cable shelf NSM A port e0a to controller A port e0c.
b. Cable shelf NSM A port e0b to controller B port e0d.
c. Cable shelf NSM B port e0a to controller B port e0c.
d. Cable shelf NSM B port e0b to controller A port e0d.
The following illustration shows cabling for one hot-added shelf using one set of RoCE capable ports
on each controller module:
2. If you are hot-adding one or two shelves using two sets of RoCE capable ports (on board and PCIe card
RoCE capable ports) on each controller module, complete the following substeps.
1508
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...