Steps
1. Cable port pair 1a/2b on each controller to stack 1:
This is the multipathed cabling for stack 1.
a. Cable controller 1 port 1a to stack 1, first shelf IOM A port 1.
b. Cable controller 2 port 1a to stack 1, first shelf IOM B port 1.
c. Cable controller 1 port 2b to stack 1, last shelf IOM B port 3.
d. Cable controller 2 port 2b to stack 1, last shelf IOM A port 3.
2. Cable port pair 2a/1d on each controller to stack 1:
This is the quad-pathed cabling for stack 1. Once completed, stack 1 has quad-pathed connectivity to each
controller.
a. Cable controller 1 port 2a to stack 1, first shelf IOM A port 2.
b. Cable controller 2 port 2a to stack 1, first shelf IOM B port 2.
c. Cable controller 1 port 1d to stack 1, last shelf IOM B port 4.
d. Cable controller 2 port 1d to stack 1, last shelf IOM A port 4.
1611
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...