2. Go to
Step 5: Complete system setup and configuration
to complete system setup and configuration.
Option 3: Cable the controllers to two NS224 drive shelves in AFF A700 and ASA AFF A700 systems running ONTAP 9.8
and later only
You must cable each controller to the NSM modules on the NS224 drive shelves on an
AFF A700 or ASA AFF A700 running system ONTAP 9.8 or later.
• This task applies to AFF A700 and ASA AFF A700 running ONTAP 9.8 or later only.
• The systems must have two X91148A modules, per controller, installed in slots 3 and 7.
• Be sure to check the illustration arrow for the proper cable connector pull-tab orientation. The cable pull-tab
for the storage modules are up, while the pull tabs on the shelves are down.
603
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...