powered on:
::> system controller slot module insert -node node1 -slot 6-2
Warning: NVMe module in slot 6-2 of the node localhost will be powered
on and initialized.
Do you want to continue? (y|n): `y`
The module has been successfully powered on, initialized and placed into
service.
7. Verify the slot status using the
system controller slot module show
command.
Make sure that command output reports status for slot 6-1 or 6-2 as
powered-on
and ready for operation.
8. Verify that the replacement caching module is online and recognized, and then visually confirm that the
amber attention LED is not lit:
sysconfig -av slot_number
If you replace the caching module with a caching module from a different vendor, the new
vendor name is displayed in the command output.
9. After you replace the part, you can return the failed part to NetApp, as described in the RMA instructions
shipped with the kit. Contact technical support at
, 888-463-8277 (North America), 00-800-
44-638277 (Europe), or +800-800-80-800 (Asia/Pacific) if you need the RMA number or additional help
with the replacement procedure.
Chassis
Replace the chassis - AFF A700 and FAS9000
All other components in the system must be functioning properly; if not, you must contact
technical support.
• You can use this procedure with all versions of ONTAP supported by your system.
• This procedure is disruptive. For a two-node cluster, you will have a complete service outage and a partial
outage in a multi-node cluster.
Shut down the controllers - AFF A700 and FAS9000
Option 1: Shut down the controllers
You must shut down the node or nodes in the chassis prior to moving them to the new
chassis.
About this task
• If you have a cluster with more than two nodes, it must be in quorum. If the cluster is not in quorum or a
healthy node shows
false
for eligibility and health, you must correct the issue before shutting down the
impaired node; see the
Administration overview with the CLI
646
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...