Step
Perform on each controller module
Cable the management ports to the management network switches
DO NOT plug in the power cords at this point.
2. To perform optional cabling, see:
◦
[Option 1: Connect to a Fibre Channel host]
◦
[Option 2: Connect to a 10GbE host]
◦
[Option 3: Connect to a single direct-attached NS224 drive shelf]
◦
[Option 4: Connect to two direct-attached NS224 drive shelves]
3. To complete setting up your system, see
Step4: Completing system setup and configuration
.
Optional cabling: Cable configuration-dependent options
You have configuration-dependent optional cabling to the Fibre Channel or iSCSI host
networks or direct-attached storage. This cabling is not exclusive; you can have cabling
to a host network and storage.
Option 1: Cable to a Fibre Channel host network
Fibre Channel ports on the controllers are connected to Fibre Channel host network
switches.
Contact your network administrator for information about connecting the system to the switches.
Be sure to check the illustration arrow for the proper cable connector pull-tab orientation.
838
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...