3. Cable port pair 1c/2d on each controller to stack 2:
This is the multipathed cabling for stack 2.
a. Cable controller 1 port 1c to stack 2, first shelf IOM A port 1.
b. Cable controller 2 port 1c to stack 2, first shelf IOM B port 1.
c. Cable controller 1 port 2d to stack 2, last shelf IOM B port 3.
d. Cable controller 2 port 2d to stack 2, last shelf IOM A port 3.
4. Cable port pair 2c/1b on each controller to stack 2:
This is the quad-pathed cabling for stack 2. Once completed, stack 2 has quad-pathed connectivity to each
controller.
a. Cable controller 1 port 2c to stack 2, first shelf IOM A port 2.
b. Cable controller 2 port 2c to stack 2, first shelf IOM B port 2.
c. Cable controller 1 port 1b to stack 2, last shelf IOM B port 4.
d. Cable controller 2 port 1b to stack 2, last shelf IOM A port 4.
Maintain
Hot-swap a disk drive in a DS224C or DS212C disk shelf - shelves with IOM12
modules
You can hot-swap a failed disk drive in a DS224C or DS212C disk shelf.
Before you begin
• The disk drive that you are installing must be supported by the DS224C or DS212C disk shelf.
• All other components in the system must be functioning properly; if not, contact technical support.
• The disk drive you are removing must be failed.
You can verify the disk drive is failed by running the
storage disk show -broken
command. The
failed disk drive appears in the list of failed disk drives. If it does not, you should wait, and run the
command again.
Depending on the disk drive type and capacity, it can take up to several hours for the disk
drive to appear in the list of failed disk drives.
• If you are replacing a self-encrypting disk (SED), you must follow the instructions for Replacing an SED in
the ONTAP documentation for your version of ONTAP.
Instructions in the ONTAP documentation describe additional steps you must perform before and after
replacing an SED.
NetApp encryption overview with the CLI
About this task
1612
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...