b. Connect the laptop or console to the switch on the management subnet.
c. Assign a TCP/IP address to the laptop or console, using one that is on the management subnet.
2. Plug the power cords into the controller power supplies, and then connect them to power sources on
different circuits.
The system begins to boot. Initial booting may take up to eight minutes
3. Assign an initial node management IP address to one of the nodes.
If the management network has
DHCP…
Then…
Configured
Record the IP address assigned to the new controllers.
Not configured
a. Open a console session using PuTTY, a terminal server, or the
equivalent for your environment.
Check your laptop or console’s online help if you do
not know how to configure PuTTY.
b. Enter the management IP address when prompted by the script.
4. Using System Manager on your laptop or console, configure your cluster:
a. Point your browser to the node management IP address.
The format for the address is https://x.x.x.x.
b. Configure the system using the data you collected in the
NetApp ONTAP Configuration guide
.
5. Verify the health of your system by running Config Advisor.
6. After you have completed the initial configuration, go to the
page for information about configuring additional features in ONTAP.
Maintain
194
Summary of Contents for AFF A700
Page 4: ...AFF and FAS System Documentation 1...
Page 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Page 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Page 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Page 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Page 437: ...1 Locate the DIMMs on your controller module 434...
Page 605: ...602...
Page 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Page 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Page 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Page 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Page 1462: ...Installing SuperRail to round hole four post rack 1459...
Page 1602: ...1599...
Page 1630: ...1627...
Page 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Page 1645: ...Guide rail 1642...
Page 1669: ...Attention LED light on 1666...